Past Projects

 

Past Projects, Case Studies, and Publications

Concordia University Environmental                        

Center                

June 2009  – May 2012

 

Location: Mequon, WI
Client: Concordia University
Contractor: Joseph Schmitt & Sons
Diversion Results:  86.69%
Services Used: Demolition of student housing and construction of academic building                             
 

           

Winnebago Nursing Home
October 2011 - January 2012

 

Location: Oshkosh, WI
Client: Winnebago County
Contractor: Veit USA
Diversion Results: 92.96%
Services Used: Pre-demolition waste assessment and deconstruction management
 

     

Wisconsin Energy Institute*

Fall 2009 - October 2012

 

Location: Madison, WI
Client: UW-Madison
Contractor: Mortenson Construction
Diversion Results:  94.92%
Services Used: Construction Waste Management Services                                            
 

 

  

UW-Oshkosh Academic Building*
November 2009 - August 2011

 

Location: Oshkosh, WI 
Client: State of Wisconsin DOA DFD
Contractor: J.P. Cullen & Sons, Inc. 
Diversion Results: 84.96%
Services Used: Demolition & Construction of new Academic Building
 

 

Monroe Clinic*

Fall 2009 - December 2011

 

Location: Monroe, WI
Client: Monoe Clinic
Contractor: C.G. Schmidt 
Diversion Results:  93.13%
Services Used: Construction Waste Management Services                                                                              
 

Altmann Construction Co, Inc. – Waste Management Center 
October 2010 - June 2011

 

Location: Wisconsin Rapids, WI
Contractor: Altmann Construction 
Diversion Results: 96.42%
Services Used: Waste Recycling tracking, documentation with WasteCapTRACE   
 

 

Center for Resilient Cities –

Resilience Research Center

May 2011 – August 2012

 

Location: Madison, WI
Client: Center for Resilient Cities
Contractor: Bachman Construction
Diversion Results: 91.56%
Services Used: Construction and Demolition Waste Management Setup             
 

UW-Madison Biochemistry II, Henry Mall
December 2008 – September 2011
 

Location:  420 Henry Mall  Madison, WI 53706
Client:  UW-Madison
Contractor:  J.H. Findorff & Son

Aurora Medical Center – Summit
July 2007 – October 2009

Location:  2350 N. Summit Avenue  Oconomowoc, WI  53066
Client: Aurora Medical Center
Contractor: Mortenson Construction
Results:  8,933 tons of material was recycled on this project, a diversion rate of 84%, meeting the project goal of 50% diversion.

Hy-Vee Weitz
September 2008 – October 2009

LEED-NC Project

Location:  3801 East Washington Avenue  Madison, WI  53714
Client: Hy-Vee Weitz Construction
Contractor: DeConstruction, Inc.
Results:  This 91,000 sqft grocery store project diverted 1611 tons of material leading to a 90% diversion rate, well above the goal of 75%

UW-Milwaukee Golda Meir Library
November 2008 – August 2009

Location:  2311 E. Hartford Avenue, Milwaukee, WI 53211
Client: UW-Milwaukee
Contractor: Titan Building Co.
Results:  This interior renovation had an overall recycling rate of about 83%, which included 160 tons of concrete diverted from landfills.

American Transmission Company
June 2008 – July 2009

LEED Gold Project
Location:  W234 N2000 Parkway Court  Pewaukee, WI  53188
Client: American Transmission Company
Contractor: Mortenson Construction
Results:  The recycling rate for this project was 84%, including 388 tons of concrete diverted from landfills.

UW-Parkside Residence Hall
July 2008 – July 2009

Location: 3737 Outerloop Road  Kenosha, WI  53144
Client: DNR for State of Wisconsin – DSF
Contractor:  J.P. Cullen & Sons
Results:  334 tons of material were recycled from this $10 million / 92,500 sqft project, leading to an overall recycling rate of about 60%. 
Johnson Controls – Glendale Campus
November 2008 – June 2009

LEED Platinum Project
Location:  5757 North Green Bay Avenue Glendale, WI  53209
Client: Johnson Controls
Contractor: Hunzinger Construction
Results:  This LEED Platinum Project recycled 7,635 tons of construction materials, and achieved an overall recycling rate of about 92%.



ONE – The North End
March 2008 – March 2009
 
LEED ND Project
Location: Milwaukee, WI
Client: Mandel Group
Contractor: KBS Construction
Results:  Crews diverted 1,841 cubic yards of reusables and recyclables, diverting 87.42% of the construction waste by reusing and recycling – exceeding our goal of 75%.

153 North Milwaukee Street
April 2008 – December 2008

LEED for Core and Shell
Location:  153 North Milwaukee Street  Milwaukee, WI  53202
Client: LaMacchia Group
Contractor:  LaMacchia Group
Results:  This demolition project recycled a total of 983 tons of material, which resulted in a 94.8% diversion rate for the project and achieved LEED Gold for Core and Shell.

Froedtert North Tower Vertical Expansion
July 2007 – December 2008

Location:  950 North 92nd Street  Wauwatosa, WI  53226
Client:  Froedtert & Medical College of Wisconsin
Contractor:  Mortenson Construction
Results:  This project added 4 stories on top of existing North Addition at Froedtert, and achieved the project's goal of 50% recycling by diverting 255 tons of material from landfills.

Prairie Apartments
July 2008 – December 2008

LEED for Homes
Location:1218 W. Highland Avenue  Milwaukee, WI  53233
Client:  Prairie Apartments
Contractor:  VJS Construction Services
Results:  This project earned 2 LEED points by diverting 75% of the construction waste, for a total of 158,000 tons of recycled material and achieved a LEED Gold Certification in the LEED for Homes program.

St. Luke’s Healing Garden
July 2008 – December 2008

Location:  2900 W. Oklahoma Avenue  Milwaukee, WI 53215
Client:  Aurora St. Lukes Hospital 
Contractor:  Mortenson Construction
Results:  Over 65 tons of construction waste was recycled from the site, which lead to an 83.6% diversion rate, meeting the goal of 75% diversion.

 
Allied Drive Demolition
July 2008 – October 2008

Location:  2300 and 2400 blocks of Allied Drive, 4705 and 4709 Jenewein Road  Madison, WI 53711
Client:  City of Madison: Department of Planning and Development
Contractor:  Champion Environmental Services
Results:  The goal for this demolition project was 75% diversion, and by the end of the project, 90% of the waste had been recycled.

Northwestern Mutual Life Insurance Company
August 2006 – September 2008

Location:  Two Northwestern Mutual  Way Franklin, WI  53132
Client:  Northwestern Mutual Life Insurance Company
Contractor:  Opus North Corporation
Results:  Crews diverted 5,179 cubic yards recyclables, diverting 71.86% of the construction waste by reusing and recycling – exceeding the goal of 50%.

UW-Stevens Point Baldwin Hall
May 2008 – August 2008

Location:  425 Isadore St. Stevens Point, WI 54481
Client:  UW-Stevens Point
Contractor:  Ellis Stone Construction, Inc.
Results:  The overall recycling rate was about 90 percent, which exceeded the project goal of 75 percent.  A total of 231 tons of construction materials were diverted from the site.

 
1212 W. Wisconsin Building, Marquette
April 2008 – June 2008

Location:  1212 West Wisconsin Avenue  Milwaukee, WI  53202
Client:  Marquette University
Contractor:  SCS of Wisconsin
Results:  Over 98% of this demolition project was recycled, the vast majority of that coming in the form of concrete/masonry.  6,866 tons of material was recycled.

Interdisciplinary Research Complex
October 2005 – April 2008

Location:  600 Highland Avenue, Madison, WI 53226
Client: University of Wisconsin 
Contractor:  Oscar J. Boldt Construction
Results:  The project achieved a 75% diversion rate – exceeding the goal of 60% – and saved the client over $200,000 by recycling waste materials.

  


Wisconsin Public Service Weston 4 Project
October 2004 – April 2008
 
Location:  2501 Morrison Avenue  Rothschild, Wisconsin 54474
Client:  Wisconsin Public Service Corp: Weston Plant
Contractor:  Washington Group International
Results:  Recycling on this project saved the client about $720,000.  The contractor was able to achieve a recycling rate of about 82%, or 9,587 tons of recycled material.

Froedtert Cancer Pavilion
November 2005 – March 2008

Location:  9000 West Doyne Ave, Wauwatosa, WI 53226
Client:  Froedtert & Medical College of Wisconsin
Contractor:  Mortenson Construction
Results:  Including the parking garage that was demolished, the recycling rate was about 96%, with about 21,111 tons of material diverted for recycling.

Harley-Davidson Museum
May 2006 – February 2008
 
Location:  500 West Canal Street, Milwaukee, WI 53203
Client:  Harley-Davidson Motor Company
Contractor:  Mortenson Construction
Results:  1,361 tons of recyclables were collected from this project, leading to a 73% diversion rate.  975 tons of concrete were recycled and the project met its goal of 50% diversion.

The Brico Fund Corporate Office
November 2005 – November 2007

Location:  1122 N. Astor Street  Milwaukee, WI 53202
Client: The Brico Fund
Contractor:  Beyer Construction
Results:  Restorations to this 150+ year old, 6,000 sqft historic house included eco-friendly pavers, recycled carpet, low VOC paint, and increased daylighting.


Walmart, Oshkosh
September 2007 – November 2007

Location:  2175 South Koeller Street  Oshkosh, WI 54902
Client:  Walmart
Contractor:  Champion Environmental Services, Inc.
Results:  More that 90 percent of the waste generated during the demolition process was recycled, including about 7000 tons of concrete.


Columbia St. Mary's Hospital: Ozaukee Campus  
January 2006 – October 2007
 
Location:  13111 N. Port Washington Road  Mequon, WI 53097
Client: Columbia St. Mary's
Contractor:  Mortenson Construction
Results:  The $63 million, 329,000 sqft project had an overall recycling rate of 79.64% by weight, well exceeding the 50% goal for the project.
Awards: 2006 Big Diverter Award for highest recycling rate on a new construction project.


JohnsonDiversey Building
June 2007 – August 2007

LEED EB Project
Location:  8310 16th Street  Sturtevant, WI  53177
Client:  JohnsonDiversey
Contractor:  Mortenson Construction
Results:  1,273 tons of construction material was recycled, producing a 58% diversion rate for this project.  The builder was able to save $16,700 by recycling on this project.

 
UW-Whitewater College of Business and Economics
May 2007 – August 2007

Location:  800 West Main Street  Whitewater, WI  53190
Client: DNR for State of Wisconsin – DSF
Contractor:  Miron Construction Co., Inc.
Results:  This 188,000 sqft building had a recycling rate of about 66%, diverting a total of 581 tons of waste from landfills.

American Family Children's Hospital
June 2005 – June 2007

Location:  600 Highland Avenue, Madison, WI  53792
Client:  American Family Children's Hospital
Contractor:  J.H. Findorff & Son, Inc.
Results: This 420,000 sqft, $65 million hospital recycled a total of 62.77% by weight, exceeding the project goal of 50% recycling rate.

Epic Systems Corporation
June 2005 – June 2007
Location:  600 Highland Avenue, Madison, WI  53792 
Client:  Epic Systems Corporation
Contractor: J.H. Findorff and Son
Results:  74% of construction wastes were recycled from this 500,000 sqft headquarters, ultimately diverting over 1,900 tons of waste from landfills.

Jansen Group – Five Projects
June 2006 – June 2007
Location: Girl Scout Camp, East Troy; Beck's Mini Mart, Saukville; Mason Temple, Milwaukee; St. Anthony's Church, Menomonee Falls; Grafton Police Department, Grafton
Contractor:  The Jansen Group
Results:  At the five sites, the total overall recycling rate was about 80%.  1,287 tons of material were recycled, and about $37,000 was saved due to reuse and recycling.

Kettle Foods: Beloit Plant   
August 2006 – March 2007

LEED Gold Project
Location: 3150 Kettle Way  Beloit, WI  53511
Client:  Kettle Foods
Contractor:  Affiliated Construction Services
Results: The Kettle Foods Beloit Plant Project is a 70,000 square foot, $8.2 million food manufacturing facility, which includes 5,000 square feet of office space.

Milwaukee Technical and Trade School Demolition 
June 2006 – December 2006

Location:  700 South 4th Street  Milwaukee, WI 53203
Client: Milwaukee Public School District
Contractor:  Champion Environmental Services
Results: The demolition had an overall recycling rate of 99.07% and cost $2.5 million to deconstruct.
Awards:  2006 Big Diverter award for highest recycling rate on a demolition project.


Columbia St. Marys Hospital – East Campus
March 2004 – June 2006 

Location:  700 South Park Street  Madison, WI  53715
Client:  St. Mary's Hospital
Contractor:  Oscar J. Boldt Construction
Results:  This project met its 50% recycling goal; diverting about 95% of construction waste and saving over $200,000 in waste hauling costs.

 
Bielinski Homes Vinyl Recycling Program
January 2004 – December 2005
 
Location:  N16 W23377 Stone Ridge Drive  Waukesha, WI 53188
Client:  Bielinski Homes
Contractor:  Bielinski Homes
Results: Bielinski Homes built about 800 homes in 2004 in fifteen neighborhoods.  In Spring, 2004, one neighborhood implemented a recycling program.  By the end of 2004, a recycling system was developed which will apply to all new neighborhoods constructed by Bielinski Homes.
Veridian Homes Vinyl Recycling Program
January 2005 – December 2005
 
Location:  Madison, WI
Client:  Veridian Homes
Contractor:  Don Simon Homes
Results:  44,440 pounds of vinyl siding was recycled from the construction of 235 new homes in the Madison area and the program was a qualified success.
Marine Terminal Lofts
April 2005 – August 2005
 
LEED Silver for Commercial Interiors Pilot Program
Location:  100 N. Broadway  Milwaukee, WI  53202
Client:  HGA
Contractor:  J.H. Findorff & Son
Results:  This project achieved an 81% diversion rate, including the reuse of 18 tons of metal and 16 tons of drywall from the building.
Madison Gas & Electric – West Campus Cogeneration Facility
November 2003 – June 2005
 
Location:  515 Walnut Street  Madison, WI 53726
Client:  Madison Gas & Electric
Contractor:  JF Ahern, AZCO, JP Cullen & Sons, and Westphall & Company, Inc.
Results:  This project achieved a 75.35% recycling rate, saving the client $103,651 and converting 2,037.45 tons of materials into valuable resources.
Retzer Nature Center Expansion
June 2004 – May 2005
 
Location:  S14 W28167 Madison Street  Waukesha, WI 53188
Client:  Waukesha County
Contractor:  Creative Construction
Results:  The 16,000 sqft expansion to the Retzer Nature Center met the goal of 75% diversion by recycling 82% of the materials from the site.
Overture Center for the Arts
November 2001 – January 2004
 
Location: 201 State Street  Madison, WI  53703
Client:  Overture Center for the Arts
Contractor:  J.H. Findorff & Son
Results:  WasteCap Wisconsin helped connect a building owner, contractors and nonprofit organizations to reuse over 1,000 items from the old Bank One and Yost buildings in Madison.
Harley-Davidson Product Development Center Expansion
April 2002 – March 2003
 
Location:  11800 West Capitol Drive  Wauwatosa, WI 53213
Client:  Harley-Davidson Motor Company
Contractor:  Affiliated Construction Services 
Results:  Crews diverted 236 tons of recyclables, saved over $10,000 in avoided disposal costs, and diverted 76.4% of the construction waste.
Schlitz Audubon Nature Center Project Final Report
December 2001 – March 2003
 
LEED Gold Project
Location:  1111 East Brown Deer Road  Milwaukee, WI 53217
Client:  Milwaukee County
Contractor:  The Jansen Group
Results:  115 tons of waste were recycled, diverting 78.7% of the construction waste, saving 42.5% in disposal costs.

Alliant Energy Headquarters

November 2000 – June 2001
 
Location:  4902 N. Biltmore Lane  Madison, WI 53718
Client:  Alliant Energy
Contractor: Opus Corporation
Results:  Waste disposal costs were cut by 33% and waste weight by 68%, which exceeded the project goal of 50% diversion.
 
If you have a case study or resource to add to this page, please contact us

 